We've Worked at Over 300 Airports Nationwide

AERO Systems Engineering and AERO BridgeWorks provide engineering, planning, construction and technical services to airports across the nation. We provide single-source solutions to our public- and private-sector clients for aviation airside design and construction projects.

We know that our reputation is maintained by the high performance standards we adhere to on every project, every day. These signature projects illustrate what AERO Group has to offer.

Delta Air Lines

NWA Fleet Integration/Boeing Fleet Winglet Project

Our exceptionally swift and complete design-build services for multiple airport projects are a hallmark of AERO’s ability to develop and implement design and construction with minimum disruption to facility operations.

US Airways

Multi-City New Aircraft Introduction Project

This fast-track design-build project provided for the integration of new aircraft into the US Airways fleet mix and encompassed 100+ domestic and international cities.

Raleigh Durham Aviation Dept./Fentress Architects

Terminal 2 North and South Concourse Replacement

This project included complete airside, planning, design and construction administration, including fleet-mix analysis, aircraft parking layouts, passenger boarding bridges and related fixed ground-support systems.

Delta Air Lines

Boston Logan Int’l Airport Terminal A Replacement

AERO performed extensive planning, design, site surveys and construction of airport ground-support systems, aircraft parking layouts and new passenger boarding bridges and walkways.

Delta Air Lines

Fleet Integration–80+ Domestic Airport Facilities

AERO performed airside planning, design and construction, fleet mix/flight schedule analysis, aircraft parking layouts, passenger boarding bridge and related fixed ground-support system engineering for the integration of the NWA fleet into the Delta Air Lines fleet mix and Boeing fleet winglet modification.

City Of Atlanta Department Of Aviation

Hartsfield-Jackson Atlanta Airport Nose Notch Project

AERO’s renovation, relocation and upgrades of 19 gate positions were accomplished through site surveys, planning and flight schedule analysis for gate flexibility at the nation’s busiest airport.

US Airways

PHX T4 Reconfiguration Project

AERO’s fast-track design and construction at Phoenix Sky Harbor International Airport enabled complete integration of new aircraft into the US Airways fleet at one of the airline’s largest hubs. AERO’s planning and construction resulted in significant cost savings and the project was completed ahead of schedule.

FMC Jetway Systems

Kansas City Int’l Airport: PBB/Terminal Improvement

Complex scheduling for construction of passenger boarding bridges and related fixed ground-support systems brought this project in on schedule and within budget.