aseproject

ASE performed airside planning, design, fleet mix/flight schedule analysis, aircraft parking layouts, passenger boarding bridge and related fixed ground-support system engineering for the integration of the NWA fleet into the Delta Air Lines fleet mix and Boeing fleet winglet....

ASE provided airside planning, engineering, and design for this 12 gate, 24 passenger boarding bridge project. The primary focus was to increase the ADG-V and ADV-VI capacity at the international terminal to accommodate the airlines’ larger aircraft and plan for future aircraft, such as the B777-9X....

ASE is deeply involved with multiple airside projects at DFW, including PBB replacements and refurbishments, central and point of use PCA upgrades, gate reconfigurations including aircraft fleet mix upsizing, and central chiller plant evaluations. In addition, ASE provided ongoing assistance to the owner in developing an equipment replacement plan for the next few years due to aging airside infrastructure....

This fast-track project provided aircraft parking designs for restriping United’s gates at over 100 airports throughout the U.S. to meet United’s latest ramp standards. This project involved initial surveys of all airports to gather existing conditions and development of new aircraft parking plans and striping layouts to meet the latest striping standards and specific airport fleet requirements....

ASE was chosen to perform the complete airside re-design of Gates C30 and C31 to allow for dual PBB servicing of A380s at C30. The project included the installation of two new PBBs walkways, foundations, GPUs, AHUs, hose retrieval systems, electrical and mechanical infrastructure, VDGS relocations, and ramp striping modifications....