ASE and ABW performed airside planning, design, construction, fleet mix/flight schedule analysis, aircraft parking layouts, passenger boarding bridge and related fixed ground-support system engineering for the integration of the NWA fleet into the Delta Air Lines fleet mix and Boeing fleet winglet....

ABW was the prime general contractor on this project, which included the removal of the original gates and walkways, pouring of new foundations, setting new gates and walkways, new electrical infrastructure, installing new PCA and GPU systems, and all civil site construction. This project was scheduled in 2 phases so as not to conflict with airport operations....

ABW was the design-build prime general contractor for the replacement of 157 aircraft docking guidance units with an advanced visual docking guidance system unit for Delta Air Lines at Terminals A, B, C, D, E, F, and T. This project included all necessary electrical/communications upgrades, breakers, ramp striping, and VDGS installation. This project was the largest single installation of ADB SafeGate’s systems in the U.S. ...

ABW was selected by the Construction Management at Risk Joint Venture, Hunt Gibbs-Boh Metro, to procure, furnish and install Passenger Boarding Bridges and Fixed Walkways for 29 new gates. ABW maintained project schedule and installed 10 PBBs per month as well as provide airside design to improve the original layout. During pre-construction services, ABW saved CMR over $2M of equipment and moved ahead of schedule....

ASE performed airside planning, design, fleet mix/flight schedule analysis, aircraft parking layouts, passenger boarding bridge and related fixed ground-support system engineering for the integration of the NWA fleet into the Delta Air Lines fleet mix and Boeing fleet winglet....

ASE provided airside planning, engineering, and design for this 12 gate, 24 passenger boarding bridge project. The primary focus was to increase the ADG-V and ADV-VI capacity at the international terminal to accommodate the airlines’ larger aircraft and plan for future aircraft, such as the B777-9X....

AERO provided airside design and construction services for the relocation of the existing Delta Air Lines Operation from Terminals 5 and 6 to Terminals 2 and 3. Twenty airlines were relocated to Terminals 5 and 6 and the Tom Bradley International Terminal. This project shifted 40% of the total airline capacity at LAX from one location to another....

ABW has completed several projects at MEM. For the Concourse B Modernization, ABW was the prime contractor, completing all airside scope including 25 new gates, PBB refurbishments, site civil, apron paving and hydrant fueling. This was a significant multi-year project that consolidated 75 gates with PBBs spread across 3 Concourses to a final 39 gates on Concourse B....

Airside construction for the replacement of 157 aircraft docking guidance units with an advanced visual docking guidance system unit for Delta Air Lines at Terminals A, B, C, D, E, F, and T. This project was the largest single installation of ADB SafeGate’s systems in the United States....