AERO provided airside design and construction services for the relocation of the existing Delta Air Lines Operation from Terminals 5 and 6 to Terminals 2 and 3. Twenty airlines were relocated to Terminals 5 and 6 and the Tom Bradley International Terminal. This project shifted 40% of the total airline capacity at LAX from one location to another....

Airside construction for the replacement of 157 aircraft docking guidance units with an advanced visual docking guidance system unit for Delta Air Lines at Terminals A, B, C, D, E, F, and T. This project was the largest single installation of ADB SafeGate’s systems in the United States....

AERO BridgeWorks has begun the installation of 13 new passenger boarding bridges (PBBs) at T5 at LAX. This project which also includes new PBB foundations and upgrades to the Pre-conditioned Air central system is being closely coordinated with the seasonal peak flight schedules with a multi-phase construction schedule. This allows uninterrupted aircraft operations for the carrier throughout this two year project....

AERO Systems Engineering is wrapping up the Airside Planning and Design Development Package for the Charleston International Airport – Terminal Redevelopment & Improvement Project. This project includes a major re-development and renovation of the existing terminal facility. We have been tasked with optimizing the airside gate operations for today’s aircraft as well as the Nex-Gen aircraft of the future. This project includes all fixed ground-support gate systems and equipment as well as an evaluation of the existing passenger boarding bridges to determine the most cost-effective approach for the project, whether that be re-use, relocation, refurbishment or replacement....